DWSmooth
10-10-2003, 02:40 PM
Terry,
Since you have been given the freedom to work on our Ls full-time I would like to see about having my wish list fulfilled. I would want to do this in Nov sometime after I receive my bonus check.
Install new plugs - NKGs or Splitfires
Install plasma boosters
Lowering 2/4 drop
Gauge Pod w/boost and air/fuel gauges
Reburn Superchips flip chip side 2 (SES light comes on with that program)
Just email me back at david.walker@ericsson.com with the prices.
Thanks,
DAVID!
Since you have been given the freedom to work on our Ls full-time I would like to see about having my wish list fulfilled. I would want to do this in Nov sometime after I receive my bonus check.
Install new plugs - NKGs or Splitfires
Install plasma boosters
Lowering 2/4 drop
Gauge Pod w/boost and air/fuel gauges
Reburn Superchips flip chip side 2 (SES light comes on with that program)
Just email me back at david.walker@ericsson.com with the prices.
Thanks,
DAVID!